My "Day Job" is a Health, Safety and Environmental professional with over 26 years in offshore oil and gas positions, the last 6 specialising in oil and gas process decommissioning and dismantling including work on Amerada Hess's Floating Production Unit AH001 re-branded for Petrofac as FPF1. Work commenced in Able UK's yard at Hartlepool with removal of topsides followed by transfer to Gdansk shipyard in Poland.
Next major role was assisting with dismantling of the U.K.'s first onshore gas terminal at Bacton in Norfolk. This work has allowed fantastic photographic opportunities with images used on each site to enhance safety management systems including Procedures: Method Statements: Inductions and Training: Incident Investigations: Audits: Presentation Materials and Time-lapse.
The pictures really painting a thousand words!
Next major role was assisting with dismantling of the U.K.'s first onshore gas terminal at Bacton in Norfolk. This work has allowed fantastic photographic opportunities with images used on each site to enhance safety management systems including Procedures: Method Statements: Inductions and Training: Incident Investigations: Audits: Presentation Materials and Time-lapse.
The pictures really painting a thousand words!
FPF1 at Able YardOn site Senior Safety Advisor contracted to Petrofac during de-struct phase of FPF1 Floating Production Unit (formally AH001). Project at ABLE UK Yard in Hartlepool involved removal via hot and cold work of 3,000 tonnes of metal including 600 tonnes of CAF contaminated material and 20 barrels of macerated NORM.
Working with the experienced, knowledgeable and thoroughly professional Able UK team with relevant HAZID/Risk Assessment, remedial actions and change management helping project delivery below budget and without LTI. |
FPF1 at Gdansk - PolandMember of audit team which visited the yard in August 2012 to agree next phase of additional destruct.